Suncor Saskatoon Terminal

Suncor Saskatoon Terminal

DG Industrial Ltd. performed significant tank floor repairs in accordance with API 653. We replaced a portion of the 3-inch foam line and also installed a 36-inch insert flush patch, a 12-inch nozzle and a reinforcing pad to conform to API 653 requirements.

Upon completion of all welding, DG Industrial procured a contractor to reduce residual stresses through Post Weld Heat Treatment over the entire fabrication.